Preventive Maintenance Program - BIESSE Techno

ServiceCost
Flat rate for 2 days (includes 16 labor hours)$1000.00 (per visit)
Any day after the 2nd day$600.00 (per visit)
Additional CostCost
Meals$35.00/day
Travel hoursActual (per visit)
Expenses (Airfare, car, lodging, etc.)Actual (per visit)

This will include a general tune-up the machine, making sure everything is working well, and recommending any parts to be changed (see checklist below).

It will not include any repair/additional training on the machine not listed in the checklist. If repair/additional training is necessary it will require a different purchase order from the customer and the regular rates will apply.

It is Biesse Group America’s discretion (depending on the technician’s schedule and on the spare parts availability) to decide if the repairs can be done at the same time of the preventive maintenance.

The program includes two (2) visits per year. The customer and Biesse Group America will come to an agreement on what time of the year is best for both to schedule preventive maintenance. BIESSE AMERICA reserves the right to schedule the visit within 14 days of the customer’s request.

Once the schedule has been established, Biesse will contact you a month before so that we can schedule a PM maintenance.

Below is a list of items that will be checked on your TECHNO
  • Machine level
  • Calibration of X-axis for Rt. Horizontal, Lower Vertical and Upper Vertical
  • Calibration of Y-axis for Lt. & Rt. Horizontal (if equipped), Lower & Upper Verticals
  • Calibration of Z-axis of Lt. & Rt. Horizontal
  • Calibration of Backstops
  • Drilling head lubrication and general conditions
  • Check condition of belts, spindles, way bar scrapers, and millimeter counters
  • Setting of front pusher and right side pusher air regulators
  • Backstop micro-switches
  • Boring unit movement: Lt. & Rt. Horizontal, Upper & Lower verticals
  • Panel support level
  • Safety cable switches
  • Infeed/outfeed motors
  • Overturning clamps
  • End-cycle micro-switch inside boring units
  • Dust Augers and covers
  • Auto-lube system
  • Hydraulic braking units
  • Dowel Bowl Vibrators (SVBL/J & InforTechno)
  • Dowel Injectors (SVBL/J & InforTechno)
  • Glue Tanks & Distribution System
  • Version of EPROM
  • Reset axes on controller (if necessary)
  • Make backup hard copy of all data (axis data, timers, I/O, machine. configuration)

  © Copyright 2008 Biesse America
Contact Biesse America